References

The most important implemented constructions are the Preparation and realization of the construction of Strategic Park Nitra for the company STRABAG Pozemné a inžinierske staviteľstvo s.r.o., Construction of Strategic Industrial Park Nitra-HTU II for the company STRABAG Pozemné a inžinierske staviteľstvo s.r.o., and Optimizing of emergency road traffic in Kremnické Bane for Metrostav, a.s.

 

Name of the construction Location Implementation Customer [Investor] Volume in thous. EUR
Expansion joint on the D3 Highway Svrčinovec-Skalité, SO 242-00 Bridge   08/2015-12/2015 Doprastav, a.s. 3 252
MO 59-090 Podbiel, optimizing the emergency state of the bridge Podbiel 11/2015-09/2016 Doprastav, a.s. 1 184
Preparation and realization of the Strategic Park Nitra construction Nitra  12/2015-09/2017  STRABAG Pozemné a inžinierske staviteľstvo s.r.o.  31 009
Construction of Strategic Industrial Park Nitra-HTU II Nitra 12/2016-In process   STRABAG Pozemné a inžinierske staviteľstvo s.r.o.  24 155
Optimizing of emergency road traffic in Kremnické Bane  Kremnické Bane  01/2017-In process Association Metrostav, a.s.  23 218
Preparation of road infrastructure – Nitra Strategic Park Nitra 08/2017-10/2017 Association "Infraštruktúra Nitra" Doprastav, a.s. 7 189

 

Photo gallery